Construction of the new Freybrücke in Berlin Spandau
One of the most important Berlin bridges was undergoing rebuilding with two lanes and a broadened sidewalk. During construction, traffic was spectacularly rerouted over a temporary bridge assembled by specialists of thyssenkrupp Infrastructure. With incremental launching and counterweighting, the two-lane temporary bridge was brought into its final position in only 36 hours. The high point was the use of a barge for bridge launch.